Associate Professors

Lanfeng Dong

Personal Information

Name: Lanfeng Dong
Date of Birth: Aug.13, 1968
Nationality: China
Institution: College of Civil Engineering and Mechanics, Lanzhou University
Address: 222 Tianshui south Road, Lanzhou 730000, China
Tel: +86-139-9312-9568, Fax: +86-931-891-4561
Email: donglanfeng@lzu.edu.cn

Education
Sep. 2000-Jun. 2008     Ph.D. in Engineering Geology, School of Civil Engineering and Mechanics,
Lanzhou University, Lanzhou, China
Supervisor: Prof. Baotian Pan
Sep. 1990-Jun. 1993      M.E. in Environmental-Engineering Geology, Department of Geology, Lanzhou University, Lanzhou, China
Supervisor: Guest Prof. Lianchang Feng, Northwest Branch of Scientific
Research Institute of Ministry of Railways, Lanzhou, China
Sep1968-Jun1990     B.E. in Engineering-Geology and Hydro-Geology, Department of Geology,
  Lanzhou University, Lanzhou, China
Appointments
Jun 1993-present       Associate Professor, College of Civil Engineering and Mechanics,
Lanzhou University, Lanzhou, China
Research Areas
Rock and Soil Mechanics and Parameter, Water Resources and Hydropower Engineering Geology
Research Grants
Jun 1993-present: Lanzhou University
1. 2004-2005  Geotechnical Parameters Analysis of dam site in the Tianshengqiao Hydropower Project, Shule River, Northwest Engineering Corporation Limited, POWERCHINA, PI
2. 2005-2006  Research on Stability Evaluation of No.2 Deformation Body in the Laxiwa Hydropower Project, Yellow River, Northwest Engineering Corporation Limited, POWERCHINA, PI
3. 2006-2007 Review Study on Engineering Geological Condition of Excavated Underground Cavern Group Surrounding Rock in the Laxiwa Hydropower Project   Yellow River, Northwest Engineering Corporation Limited, POWERCHINA, Co-PI
4. 2006-2007  Geological Disasters Investigation on Debris Flow in dam site of Dahejia Hydropower Project, Yellow River, Northwest Engineering Corporation Limited, POWERCHINA, PI
5. 2007-2008  Review Study on Quality Classification of Excavated Engineering Rock in dam site of the Laxiwa Hydropower Project, Yellow River. Northwest Engineering Corporation Limited, POWERCHINA, Co-PI
6. 2007-2008  Review Study on Reformation of Reservoir Bank and Reservoir Seepage area in the Suzhi Hydropower Project, Yellow River. Northwest Engineering Corporation Limited, POWERCHINA, PI
7. 2007-2008  Analysis Compilation of Monitoring Technology Data on Landslide, Northwest Engineering Corporation Limited, POWERCHINA, PI
8. 2006-2008  Study of Slope Stability on spillway of Jishixia Hydropower Project, Yellow River. Northwest Engineering Corporation Limited, POWERCHINA, PI
9. 2008-2009  Research on Engineering Characteristics and Fracture Development in dam site of the Laxiwa Hydropower Project, Yellow River, Northwest Engineering Corporation Limited, POWERCHINA, Co-PI
10. 2009-2010:Research on Stability Evaluation and Mechanism of Deformable Landslide Formation in right bank dam site of  the Wunonglong Hydropower Project,  Jinsha River, Northwest Engineering Corporation Limited, POWERCHINA, PI
11. 2011-2012  Prehistoric Geological Disaster and Gelongbu Landslide in the upper reaches of the Yellow River,  SCUT,  LZUJBKY-2011-7
Refereed Publications
1. DONG Sheng-Shi,DONG Lan-Feng*,WEN Zhi,YU Qi-hao, Study of constitutive relation of interface between frozen Qinghai-Tibet silt and concrete,Rock and Soil Mechanics Jun. 2014,